04 Meeting witih Shore Personnel(I)
05 Meeting with Shore Personnel(II)
06 Job Interview of Engineers(I)
07 Job Interview of Engineers(II)
08 Names of Main Engine Parts(I)
09 Names of Main Engine Parts(II)
10 Parts of Diesel Engine
11 Prinples of Diesel Engine
13 Cooling System Operation(I)
14 Cooling System Operation(II)
15 Maintenance of cooling system(I)
16 Maintenance of Cooling System(II)
17 Maintenance of Cooling Water System
18 Main Engine Operation Monitoring(I)
19 Main Engine Operation Monitoring(II)
20 Four-stroke Diesel Engine
21 Main Engine Remote System(I)
22 Main Engine Remote System(II)
23 Operation of Generator(I)
24 Operation of Generator(II)
25 Principles of Air Compressor(I)
26 Principles of Air Compressor(II)
27 Working Principles of Air Compre
28 Oily Water Separator Operation1
29 Oily Water Separator Operation2
30 Oily Water Separator Operation3
31 Pollution Treatment on Board(I)
32 Pollution Treatment on Board(II)
33 The working Principle of OWS
34 Ballast Water System(I)
35 Ballast Water System(II)
36 Deck Machinery Operation(I)
37 Deck Machinery Operation(II)
39 Fire Prevention and Fire Fightin
40 Fire Prevention and Fire Fightin
42 Fire Signal and Fire Drill
43 Introduction to Fire Extinguishe
44 Communication with Deck Officers(I)
45 Communication with Deck Officers(II)
48 Check Telegraph, Steering Gear and Clock(I)
49 Check Telegraph, Steering Gear and Clock(II)
50 Evacuation and Abandon Ship(I)
51 Evacuation and Abandon Ship(II)
52 Marine Evacuation Systems
54 Abandon Ship Drill(II)
55 Davit Launched Liftrafts
57 Oil Spill Response(II)
59 Personal Injuries and Rescue(I)
60 Personal Injuries and Rescue(II)
61 Preparing the Ship for Dock Repair(I)
62 Preparing the Ship for Dock Repair(II)
66 During Dock Repair(II)
69 Development for Ship's Survey